Skip to content
Start Date: January 2017
Funding: City of Seattle Department of Transportation (SDOT), Pacific Northwest Transportation Consortium (PacTrans)
Project Budget: $240,000
Principal Investigator(s): Dr. Anne Goodchild
Summary:
Part of the Final 50 Feet Research Program, this project contains: a curb occupancy study, a survey of First and Capitol Hill Loading Bays, a pilot test at Seattle Municipal Tower, and the development of a toolkit. Taken together with the Urban Freight Lab's earlier private infrastructure inventory (Seattle Center City Alley Infrastructure Inventory and Occupancy Study 2018) in Downtown Seattle, Uptown, and South Lake Union, this project finalizes the creation of a comprehensive Center City inventory of private loading/unloading infrastructure. The study also provides the city with on-the-ground data on the current use and operational capacity of the curb for commercial vehicles, documenting vehicle parking behavior in a three-by-three city block grid around each of five prototype Center City buildings: a hotel, a high-rise office building, an historical building, a retail center, and a residential tower. Researchers also tested a new urban goods delivery system strategy: Common Carrier Locker Systems. Tools used by the Urban Freight Lab are publicly available in an Urban Goods Delivery Toolkit, a one-stop-shop for planners to replicate this work in other cities.
Keywords:
Final 50 Feet
Start Date: August 2017
Funding: Pacific Northwest Transportation Consortium (PacTrans), City of Seattle Department of Transportation (SDOT), Supply Chain Transportation & Logistics Center
Project Budget: $80,000
Principal Investigator(s): Dr. Anne Goodchild
Summary:
The purpose of the research project was to test two promising strategies to reduce the number of failed first delivery attempts in urban buildings: (1) A common carrier smart locker system; and (2) grouped-tenant-floor-drop-off-points for medium sized parcels if the locker is too small or full. The pilot was held in the 62-story Seattle Municipal Tower skyscraper in Downtown Seattle and was open to the first 100 tenants who signed up to participate. 
Start Date: September 2017
Funding: City of Seattle Department of Transportation (SDOT), Pacific Northwest Transportation Consortium (PacTrans)
Principal Investigator(s): Dr. Anne Goodchild
Summary:
The UFL engaged multiple partners and funding sources to successfully pilot test a common carrier locker system (open to all retail and multiple delivery firms) in the 62-floor Seattle Municipal Tower skyscraper. The study tested the ability of these new mini-distribution centers to create delivery density and reduce the time delivery people have to spend in urban towers to complete the work. The Lab collected “before” and “after” data to evaluate the pilot's premise: that when delivery trucks can pull into a load/unload space that's close to a mini-distribution node with delivery density (lots of deliveries in one place), everyone benefits. UFL members UPS and the U.S. Postal Service participated in this pilot, so any package they delivered to the building went into the locker system. The pilot was open to the first 100 Municipal Tower tenants who signed up to use the lockers from March to April 2018.
Start Date: April 2019
Funding: University of Washington Department of Laboratory Medicine
Principal Investigator(s): Dr. Anne Goodchild
Summary:
The Urban Freight Lab primarily focused on optimizing UW Department of Laboratory Medicine's 12 routes per day, moving lab specimens and conducting departmental business. The work will optimize the minimize both the expected lead time (from the time the specimens are ready for pick up to the time they are delivered to the lab for testing) and the extent to which couriers work outside of their maximum shift durations.
Start Date: March 2018
Funding: City of Seattle Department of Transportation (SDOT)
Project Budget: $160,000
Principal Investigator(s): Dr. Anne Goodchild
Summary:
The City of Seattle granted a permit to United Parcel Service, Inc. (UPS) in fall 2018 to pilot test a new e-bike parcel delivery system in the Pioneer Square/Belltown area for one year. The Seattle Department of Transportation (SDOT) commissioned the Urban Freight Lab (UFL) to quantify and document the public impacts of this multimodal delivery system change in the final 50 feet of supply chains, to provide data and evidence for development of future urban freight policies. The UFL will conduct analyses into the several research questions.
Start Date: January 2022
Funding: Urban Freight Lab
Project Budget: $180,000
Principal Investigator(s): Dr. Anne Goodchild
Summary:
The Urban Freight in 2030 project explores emerging trends shaping urban freight and their implications for sustainable development. Drawing on the expertise of Urban Freight Lab members, partners, researchers, and subject matter experts, the project develops a shared vision for the future of urban delivery. The resulting vision documents outline key opportunities, challenges, and strategic priorities for urban freight systems through 2030.
Start Date: February 2024
Funding: Vinnova (Verket för innovationssystem) Sweden's Innovation Agency - Future Mobility Innovation Funding for collaborations between Sweden and the USA
Project Budget: $96,000
Principal Investigator(s): Dr. Giacomo Dalla Chiara
Partner(s): KTH Royal Institute of Technology (Sweden)
Summary:
This project studies delivery drivers’ walking and parking behavior in urban logistics, where much of last-mile delivery happens outside the vehicle. A collaboration between the Urban Freight Lab and KTH Royal Institute of Technology, the goal is to model these behaviors and evaluate solutions like e-carts and improved parking strategies to support more efficient and sustainable urban delivery.
Start Date: January 2020
Funding: City of Seattle Department of Transportation (SDOT)
Project Budget: $65,000
Principal Investigator(s): Dr. Anne Goodchild
Project Manager(s): Dr. Giacomo Dalla Chiara
Summary:
Seattle DOT has engaged the Urban Freight Lab to conduct research to explore strategies to alleviate congestion impacts and minimize the disruption of goods and service delivery to West Seattle during the closure of the West Seattle High Bridge, which connects the West Seattle peninsula to the rest of the city.
Start Date: January 2022
Funding: City of Seattle Department of Transportation (SDOT)
Project Budget: $60,000
Principal Investigator(s): Dr. Anne Goodchild
Project Manager(s): Dr. Giacomo Dalla Chiara
Summary:
In Phase 2 of the West Seattle Bridge Case Study, the research team will shift the focus from business establishments to consumers. In particular, we will explore consumer behavior, defined as how people choose to buy goods and services and where they buy them, to better understand residential demand and accessibility of goods for WS residents.  
Start Date: May 2024
Funding: U.S. Department of Transportation (USDOT) SMART (Strengthening Mobility and Revolutionizing Transportation) Grants Program, Cityfi (prime contractor)
Project Budget: $45,000
Summary:
This project will test an innovative set of incentives and regulations to better understand what technology and strategies municipalities can use to support and reduce greenhouse gas emissions in the freight sector.
Start Date: January 2024
Funding: Urban Freight Lab
Project Budget: $100,000
Summary:
Seattle is part of C40’s Zero Emission Area Programme, which aims to restrict fossil fuel vehicles in designated zones to reduce emissions and test zero-emission policies. This project examines the impacts on urban freight and logistics, including EV adoption challenges and emerging strategies such as e-cargo bikes, curb management, and consolidation approaches.