Shipping Resilience: Strategic Planning for Coastal Community Resilience to Marine Transportation Risk (SIREN)

Many coastal communities across Canada are highly dependent upon maritime transportation systems that are vulnerable in natural disasters. This project aims to improve understanding of how coastal maritime transportation systems would be disrupted in natural hazard events, how such disruption would impact coastal communities, and what strategies could effectively address this risk.

Ports across Canada are vulnerable in natural disasters, and their disruption can pose severe consequences for marine transportation systems and the coastal communities that rely on them. This project aims to improve understanding of how different types of ports may be affected in hazard events, with focus on catastrophic earthquake risk in coastal British Columbia, and consideration of severe hurricane damage to ports in Eastern Canada.

Focusing on the movement of people and goods in the emergency response phase of a disaster, the research team develops new tools, information, and risk assessments to support preparedness planning by local and provincial governments and the transportation sector. Through iterative engagement with stakeholders, the research is also intended to foster dialogue and shared understandings of risk that are necessary for resilience planning.

The research consists of an interrelated set of activities:

  • Organization of workshops for engaging government and transport sector stakeholders.
  • Development of a framework for assessing community resilience to shipping and port disruption.
  • Development of a model and simulation tool for the coastal maritime transportation system and regional multimodal logistics system.
  • Development of a simulation model for port operations and vulnerabilities to natural hazards.
  • Development of an approach for evaluating the effectiveness of the modelling approach.

Research questions:

  1. How would a major disaster likely affect marine transportation routes?
  2. How would this marine transportation disruption affect the movement of people and resources in the emergency response phase?
  3. What strategies (e.g., alternate routes and/or transport modes) would be effective for different types of communities in alleviating the potential consequences?
  4. Will a port be available, and in what state, after a natural hazard event, considering its own vulnerability and the vulnerability of interdependent infrastructure (e.g., road access, electric power)?
  5. Based on expected states, what ports could be used for ingress and egress of populations and resources during the immediate and sustained response phases of a catastrophic disaster?
  6. What strategies would be effective for different types of ports to reduce failure risk or improve functional resilience?
Presentation

Scheduling Double Girder Bridge Crane with Double Cycling in Rail-Based Transfer Automated Container Terminals

 
Download PDF  (0.44 MB)
Publication: Second Institute for Operations Research and the Management Sciences (INFORMS) Transportation Science and Logistics Society Workshop
Volume: 13-Jun
Publication Date: 2016
Summary:
In automated container terminals, rail based horizontal transfer systems are newly proposed and regarded to be more suitable to intermodal transportation [1]. However, improvements are required in operations scheduling in rail based transfer automated container terminals (RBT-ACT) to take advantage of the infrastructure improvement [2].
In this paper a double girder bridge crane (DGBC) is introduced, whose benefits can be obtained with modest investments, such as combining the existing twin 40-ft double trolley container cranes with a double girder [3]. Each girder has one independent spreader, and the two spreaders work on containers in adjacent bays simultaneously with no change to the safety distance constraints. As a result, operating costs are reduced, potential collision of QCs can be avoided and the vessel service time is reduced.
Most research in this area aims to minimizing crane cycles, not processing times [4], however is it processing time that is of ultimate interest [5]. Our objective is to minimize total processing time, and the sequence dependent setup time is considered [6]. It is well established that double cycling can greatly improve quay crane productivity [7], and we consider its performance in the scheduling strategy for DGBC.

 

 

 

Authors: Dr. Anne Goodchild, Dandan Wang, Xiaoping Li
Recommended Citation:
Wang, D., Goodchild, A., & Li, X. (2013, June). Scheduling double girder bridge crane with double cycling in rail based transfer automated container terminals. In Logistics Society Workshop (p. 91).